[SMM Analysis]REPT and Hyosung Heavy Industries Reach 2.5 Gwh ESS Strategic Cooperation

Published: May 29, 2025 21:02
Source: SMM
[SMM Analysis]On May 27, 2025, REPT Battero Energy Co., Ltd. (hereinafter referred to as "REPT Battero") and Hyosung Heavy Industries (hereinafter referred to as "Hyosung") officially signed a Memorandum of Understanding (MoU) for strategic cooperation, marking the beginning of in-depth collaboration in the energy storage system (ESS) sector. This cooperation focuses on key areas such as ESS battery cell supply, system integration, and market promotion.

On May 27, 2025, REPT Battero Energy Co., Ltd. (hereinafter referred to as "REPT Battero") and Hyosung Heavy Industries (hereinafter referred to as "Hyosung") officially signed a Memorandum of Understanding (MoU) for strategic cooperation, marking the beginning of in-depth collaboration in the energy storage system (ESS) sector. This cooperation focuses on key areas such as ESS battery cell supply, system integration, and market promotion.

According to the agreement signed by both parties, REPT Battero will provide Hyosung with up to 2.5 GWh of ESS battery cells, modules, and DC-side containers. Meanwhile, REPT Battero will also share its advanced technologies and rich experience in system design integration and quality control. Hyosung, leveraging its extensive channel network in the global power equipment market, will be responsible for product localization adaptation, certification, and promotion, facilitating the global application of the cooperation outcomes.

The core product supplied by REPT Battero in this collaboration is its new-generation 392Ah ESS battery cell. This cell boasts outstanding performance metrics, with an energy density of up to 415 Wh/L and a cycle life exceeding 12,000 cycles. Additionally, the cell has successfully passed the GB 44240-2024 shallow puncture test, demonstrating high safety by remaining fire- and explosion-proof under thermal runaway conditions. This enables it to easily withstand extreme climatic conditions and high-load application scenarios.

The jointly developed Powtrix™ DC-side containerized energy storage system by both parties has also attracted significant attention. With a capacity of 6.26 MWh, the system innovatively incorporates AI-powered intelligent operation and maintenance (O&M) and active balancing technologies. In practical applications, the Powtrix™ system can significantly reduce downtime by 20% while increasing battery utilization rate by 15%, showcasing excellent performance and reliability. The system also offers flexible configuration capabilities, allowing easy adjustment to a 4-hour long-duration energy storage (LDES) version or a 2-hour rapid-response version to meet the diverse needs of different customers.

Hyosung Heavy Industries possesses profound technical expertise and rich experience in high-energy-consuming industries such as power and steel. Leveraging its professional integration capabilities in KTL certification in South Korea, as well as UL and IEC standards in Europe and the United States, Hyosung Heavy Industries will accelerate the entry of the jointly developed products into high-growth-potential markets such as Southeast Asia and North America, significantly shortening the project implementation cycle. In addition to this collaboration with Hyosung Heavy Industries in the South Korean market, REPT Battero's production site in Indonesia, with an annual capacity of 8 Gwh, will officially commence operations in 2025, primarily to meet the demand for new energy heavy-duty trucks and grid-side ESS in Southeast Asia. Furthermore, REPT Battero's subsidiary in Europe (located in Munich, Germany) has established close cooperative relationships with internationally renowned automakers such as Stellantis and Volvo. In 2024, REPT Battero's overseas revenue surged by 526.65% YoY, demonstrating strong market expansion capabilities and international competitiveness.

SMM New Energy Industry Research Department

Cong Wang 021-51666838

Xiaodan Yu 021-20707870

Rui Ma 021-51595780

Disheng Feng 021-51666714

Yujun Liu 021-20707895

Yanlin Lü 021-20707875

Zhicheng Zhou 021-51666711

Haohan Zhang 021-51666752

Zihan Wang 021-51666914

Xiaoxuan Ren 021-20707866

Jie Wang 021-51595902

Yang Xu 021-51666760

Boling Chen 021-51666836

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago